APQP phase gate management and PPAP documentation for automotive product launches. Covers all 5 APQP phases, phase gate checklists, PPAP 18 elements, PSW generation, timing plans, and open issues tracking. USE WHEN user says 'APQP', 'PPAP', 'phase gate', 'product launch', 'PSW', 'PPAP elements', 'launch readiness', 'timing plan', or 'program management'. Integrates with PFMEA, ControlPlan, and MSA skills.

Data & Analytics

What this skill does


# APQP/PPAP - Advanced Product Quality Planning & Production Part Approval

## When to Activate This Skill
- "What APQP phase are we in?"
- "Create a phase gate checklist"
- "What PPAP elements are required?"
- "Generate a PSW for [part]"
- "Create a timing plan for [program]"
- "Track open issues for [launch]"
- "What's needed for PPAP Level [X]?"
- "Run readiness review"

## Workflow Routing

| Workflow | Trigger | File |
|----------|---------|------|
| **PhaseGate** | "phase gate review", "gate checklist" | `Workflows/PhaseGate.md` |
| **PpapPackage** | "PPAP elements", "PPAP submission" | `Workflows/PpapPackage.md` |
| **TimingPlan** | "timing plan", "launch schedule" | `Workflows/TimingPlan.md` |
| **OpenIssues** | "open issues", "issue tracker" | `Workflows/OpenIssues.md` |

---

## APQP Five Phases

### Phase 1: Plan and Define Program
**Purpose:** Determine customer needs and expectations

**Key Deliverables:**
| Deliverable | Description | Owner |
|-------------|-------------|-------|
| Voice of Customer | Customer requirements documented | Commercial |
| Business Plan | Program justification, capacity, investment | GM |
| Product/Process Assumptions | Initial feasibility assessment | Engineering |
| Product Assurance Plan | Quality objectives, reliability goals | Quality |
| Preliminary BOM | Initial bill of materials | Engineering |
| Preliminary Process Flow | High-level manufacturing concept | Mfg Eng |
| Preliminary Special Characteristics | Initial CC/SC identification | Quality |
| Management Support | Resource commitment | GM |

**Gate 1 Criteria:**
- [ ] Customer requirements documented and reviewed
- [ ] Feasibility assessment complete
- [ ] Resource plan approved
- [ ] Risk assessment performed
- [ ] Timing plan established

---

### Phase 2: Product Design and Development
**Purpose:** Develop design to near-final form

**Key Deliverables:**
| Deliverable | Description | Owner |
|-------------|-------------|-------|
| DFMEA | Design Failure Mode Effects Analysis | Design Eng |
| Design for Manufacturability (DFM) | Manufacturing input to design | Mfg Eng |
| Design Verification Plan | DVP&R creation | Design Eng |
| Engineering Drawings | Released with GD&T | Design Eng |
| Engineering Specifications | Material, performance specs | Design Eng |
| Prototype Build | Sample parts for validation | Multiple |
| Prototype Control Plan | Inspection plan for prototypes | Quality |
| Special Characteristics (Updated) | CC/SC finalized | Quality |

**Gate 2 Criteria:**
- [ ] DFMEA complete (RPN addressed)
- [ ] Design reviews completed
- [ ] Drawings released
- [ ] Prototypes built and validated
- [ ] Design verification results acceptable
- [ ] Special characteristics agreed with customer

**Note:** For contract manufacturing (MNMUK), Phase 2 is often customer-led. Focus on DFM feedback and prototype support.

---

### Phase 3: Process Design and Development
**Purpose:** Develop manufacturing process

**Key Deliverables:**
| Deliverable | Description | Owner |
|-------------|-------------|-------|
| Process Flow Diagram | All operations mapped | Mfg Eng |
| Floor Plan Layout | Equipment and flow layout | Mfg Eng |
| Characteristics Matrix | Link characteristics to operations | Quality |
| PFMEA | Process Failure Mode Effects Analysis | Quality/Mfg Eng |
| Pre-Launch Control Plan | Enhanced control for validation | Quality |
| Process Instructions | Operator work instructions | Mfg Eng |
| MSA Plan | Measurement system analysis plan | Quality |
| Preliminary Process Capability Plan | Cpk study plan | Quality |
| Packaging Standards | Pack spec developed | Logistics |
| Management Support (Updated) | Confirm resources | GM |

**Gate 3 Criteria:**
- [ ] Process flow complete and approved
- [ ] PFMEA complete (high RPNs addressed)
- [ ] Pre-launch control plan approved
- [ ] Work instructions drafted
- [ ] MSA plan established
- [ ] Tooling/equipment ordered or available
- [ ] Packaging spec approved

---

### Phase 4: Product and Process Validation
**Purpose:** Validate manufacturing process

**Key Deliverables:**
| Deliverable | Description | Owner |
|-------------|-------------|-------|
| Significant Production Run | PPAP quantity produced | Production |
| MSA Results | Gage R&R complete | Quality |
| Preliminary Process Capability | Initial Cpk/Ppk studies | Quality |
| Production Part Approval | PPAP package complete | Quality |
| Production Validation Testing | Performance testing | Quality |
| Production Control Plan | Final control plan | Quality |
| Quality Planning Sign-Off | Team approval | Cross-functional |
| PSW | Part Submission Warrant | Quality |

**Gate 4 Criteria:**
- [ ] Significant production run complete
- [ ] MSA acceptable (<10% GR&R for CC, <30% for SC)
- [ ] Process capability acceptable (Ppk ≥1.67 for CC, ≥1.33 for SC)
- [ ] PPAP package complete per customer level
- [ ] Customer approval (PSW signed)
- [ ] Production control plan implemented
- [ ] Operators trained

---

### Phase 5: Feedback, Assessment and Corrective Action
**Purpose:** Continuous improvement during production

**Key Activities:**
| Activity | Description | Frequency |
|----------|-------------|-----------|
| Variation Reduction | Reduce process variability | Ongoing |
| Customer Satisfaction | Monitor complaints, returns | Monthly |
| Delivery Performance | OTD tracking | Weekly |
| Lessons Learned | Capture and share | Per program |
| Control Plan Updates | Based on experience | As needed |
| PFMEA Updates | Based on field issues | As needed |

**Ongoing Requirements:**
- [ ] Customer complaints tracked and resolved
- [ ] Process capability maintained
- [ ] Control plans current
- [ ] Lessons learned documented
- [ ] Continuous improvement projects active

---

## PPAP Submission Levels

| Level | Requirements | When Used |
|-------|--------------|-----------|
| **Level 1** | PSW only | Customer trusts supplier |
| **Level 2** | PSW with product samples and limited data | Reduced documentation |
| **Level 3** | PSW with product samples and complete data | **Default** |
| **Level 4** | PSW with complete data (no samples) | Customer-specific |
| **Level 5** | PSW with product samples and complete data at supplier site | Customer review on-site |

**MNMUK Default:** Level 3 unless customer specifies otherwise.

---

## PPAP 18 Elements

### Element Checklist

| # | Element | Level 1 | Level 2 | Level 3 | Level 4 | Level 5 | Owner |
|---|---------|---------|---------|---------|---------|---------|-------|
| 1 | Design Records | R | S | S | * | R | Engineering |
| 2 | Authorized Engineering Change Documents | R | S | S | * | R | Engineering |
| 3 | Customer Engineering Approval | R | R | S | * | R | Commercial |
| 4 | Design FMEA | R | R | S | * | R | Engineering |
| 5 | Process Flow Diagram | R | R | S | * | R | Mfg Eng |
| 6 | Process FMEA | R | R | S | * | R | Quality |
| 7 | Control Plan | R | R | S | * | R | Quality |
| 8 | Measurement System Analysis | R | R | S | * | R | Quality |
| 9 | Dimensional Results | R | S | S | * | R | Quality |
| 10 | Material, Performance Test Results | R | S | S | * | R | Quality |
| 11 | Initial Process Studies | R | R | S | * | R | Quality |
| 12 | Qualified Laboratory Documentation | R | S | S | * | R | Quality |
| 13 | Appearance Approval Report (AAR) | S | S | S | * | R | Quality |
| 14 | Sample Production Parts | R | S | S | R | R | Quality |
| 15 | Master Sample | R | R | S | * | R | Quality |
| 16 | Checking Aids | R | R | S | * | R | Quality |
| 17 | Customer-Specific Requirements | R | R | S | * | R | Quality |
| 18 | Part Submission Warrant (PSW) | S | S | S | S | S | Quality |

**Legend:** S = Submit to customer | R = Retain at supplier | * = Retain and submit on request

---

## Element Details

### Element 1: Design Records
- Released engineering drawings
- CAD data if applicable
- Current revision level
- All engineering specifications referenced

### Element 2: Authorized Engineering Change Docum